KDV plant, communal waste processing
1. Product: Our diesel oil from waste has the same quality as the diesel sold at petrol stations, because it meets EN 590 and can be used as a fuel for all diesel engines.
2. Production costs: Production costs per 1 liter of diesel oil are only 14 euro cents.
3. Municipal waste: We have full capacity of waste needed for processing.
4. Assumption payback period: total 12 years
2 years for construction + 10 years of operation
5. Expected date of implementation - start + end: 2022-2024
6. Project readiness:
The project is fully ready for implementation. The project has secured all the components required for implementation (supplier of technology for waste treatment, land, municipal waste for the entire duration of the project, project team, and guarantor from the Technical University of Košice).
All the necessary contractual arrangements are negotiated and ready for signature and implementation (Contract for the supply of technology, the contract for the purchase of land, the contract for the supply of waste).
7. Detailed information was intentionally omitted. We have prepared feasibility study, basic questionnaire, budget and investment plan.